Satkhira
BWDB
Ongoing
Construction of Protective work /slope protection work along the bank of the river Maloncho/Kholpetua/Kalindi at various points of Shyamnagar upazila in Polder No. 5 from km 102.120 to km 102.820 = 700m, km 105.514 to km 105.680=166m (slope protection work), in between km 107.000 to km 107.120 and km 107.270- km 107.780=630m, km 111.640 to km 112.140 =500m, km 126.100 to km 126.600= 500m in connection with Disaster Risk Management Enhancement Project (Component-1, BWDB Part) under Satkhira O&M Division-1, BWDB, Satkhira during the year 2021-24.