Re-sectioning/Construction of right flood embankment of Kushiyara River for a length of 5.00km (from km 77.900 to 79.320 and km 79.420 to km 83.000 = 5.00 km) in C/W “Upper Surma – Kushiyara Project” in Upazilla- Beanibazar, Dist.- Sylhet Under Sylhet O&M Division BWDB, Sylhet, during the year 2009-2010.

Executive Engineer, Sylhet O&M  Division, BWDB, Sylhet.

Mr. Moksood-Unnayan (JV), Enderson Road, Cox’s Bazar.