Rehabilitation of embankment in CEP Polder No.- 66/2 in Upazila & District- Cox’s Bazar by (A) Re-Construction of embankment: total length 1.510 km. between km. 2.000 to km. 10.500; (B) Slope protection of embankment: total length 0.660 km. between km. 1.500 km. to km. 10.500; (C) Re-sectioning of embankment: total length 9.190 km. between km. 0.000 to km. 16.500 and (D) Rehabilitation of 15 nos. Regulator during the FY 2011-2012.

Executive Engineer, Cox’s Bazar O&M Division, BWDB, Cox’s Bazar.

RC-UI (JV), Enderson Road, Cox’s Bazar